The Very Beginning

Virgin Ground

Some of the many volunteers

Setting the footings

Footings done

Ready for the walls

Underground plumbing done

Exterior & vault walls are up

Concrete floor for the bullet trap

Starting the rafters

Half of the rafters installed

Interior walls going up

Back wall of the classroom

Bullet trap in place

Outside ready for siding

 

Interior Under Construction

Awesome air exchange system

Alexis, Madison & Breann approve

Big classroom

Women's bathroom

Rodney, Wes & Breann

Prop / Tool storage room

Vault door hung

Gun racks up in vault

Taking a break

Steel backing on the baffles

Sound deadening material on the walls

Jerry gluing

Mark cutting

Dave - What was that measurement again?

George and Marlin hanging it straight

And overhead

Walls and ceiling - DONE!

 

 

Finished Range

Thank you everyone for helping

Southside view

Northside view

Front doors and vestibule

Main hallway

Big classroom

Finally comfortable chairs

Computer / DVD / VHS for overhead projection system

Projection System - Thanks NRA!

Beutiful kitchen cabinets

Appliances

Wash area in mechanical room

Radiant heat throughout the entire building

Top notch electric service

Womens bathroom

Womens bathroom

Mens bathroom

Secondary hallway

Locker room and bulitin board

Door to range

Lots of lockers for rent

Target room

Rolling target stands

Chairs for watching

Target stands at the 50' line

Vault door

Vault room

ND's only 25 yard indoor range

Bullet trap system

Bullet trap exhaust system

Heated prefilter and HEPA filter air exchange system

Air exchange system

Air exchange system

Heated return duct